5-S and Engineering Waste Reduction

The 5-S philosophy is associated with lean thinking.is not important that every employee be busy in the
The objective of lean thinking is to provide aproduction of goods and services, especially during
business with long-term profitability by developing aslow times. Rather than overproduction, a better use
more effective workplace, which is accomplished byof employee time would be maintenance or
eliminating waste in the work environment. The resultimprovement activities.
is a safer workplace, improved product quality, andThe Waste of Over Processing
lower costs for both the business and its customers.The waste of over processing is doing more than is
Lean thinking may result in a reduction in work force,required or desired by the customer. An example
but that is not its purpose. In fact, the application ofmight be the addition of a "just in case" quality
lean thinking for the purpose of reducing the workinspection at the end of a process when the data
force is not lean thinking at all. Since some companiesindicates that it is not needed. The customer pays
have done this, lean thinking has been given a badfor that unneeded inspection step. Another example
reputation and has made waste reduction effortsis the need of multiple approval signatures for an
more difficult.activity when only one signature will do. This creates
The 5-S approach involves five activities in thetime delays and increases cost.
workplace: scrapping, sorting, scrubbing, standardizing,The Waste of Waiting
and sustaining. Depending upon which book you read,The waste of waiting manifests itself in many ways.
there may be different names for each S, but theA bottleneck in a process causes the waste of idle
intent is the same.time in the next process step and back ups in the
Scrapping means to throw away unneeded material.previous process step. Long checkout times cause
A trashy work environment, in addition to beingthe waste of waiting for the customer. Labor cost,
unsafe, tends to create a casual attitude towardlost customers, and expediting are examples of
quality. There should be a strategy for knowing whatincreases in costs associated with waiting.
to keep and what to throw away. Take junk mail forThe Waste of Correction
example. It should only be handled once. Look at it,The waste of correction is associated with not doing
decide to use it or throw it away, and then take thea job right the first time. In process mapping the
appropriate action. When junk mail is handled morephenomena of hidden factories are discovered. They
than once, it piles up on your desk making normalare the result of mistakes made in the process that
productive work more difficult. The same thingmust be corrected. The customer winds up paying
happens in a shop with trash and old parts, and in afor the wasted materials and time.
store with boxes and packing material.The Waste of transportation
Sorting is the process of placing everything where itTransportation waste is centered on the physical
belongs. Imagine a toolbox where the drill bits aremovement of goods and materials. Common causes
scattered throughout. If a bit is needed, it will takeof transportation waste are partially full containers,
some time to find the bit. This adds time and cost tooff-site warehousing, and multiple handling of material.
work. Now imagine a toolbox with the drill bitsAn example would be a coal-fired power plant that is
organized in a labeled drawer and separated logicallybuilt a long way from the nearest coal. They will
by size. The time necessary to find the needed bitalways have a large fuel transportation cost. Another
and get the job done is shortened, and the cost ofexample would be an inefficient layout of process
the work is reduced.functions. Consider an assembly line where
Scrubbing the work environment involves cleaning thecomponents must be moved from place to place for
work area. A clean work area is safer than a dirtyassembly as opposed to an assembly line where a
one and is conducive to higher quality work. It iscomponent is finished at the location where it is
related to discarding scrap but goes further byneeded next.
including the cleaning up of what is left. Consider aThe Waste of Motion
machine shop where cutting oil is left on the floor.This is the waste of the unnecessary movement of
This becomes a slipping hazard and indicatespeople around a process. Examples are walking
sloppiness. If you were inspecting machine shops toexcessive distances, excessive repetitive actions, and
see which one to hire, what would you think aboutexcessive spread of resources within a process. An
the shop with an oil mess on the floor?example might be having one fax machine in a
Another example of the importance of scrubbing isfive-story building.
preventative maintenance. In a manufacturing facility,The Waste of Inventory
for example, the machining equipment can be paintedThis is similar to the waste of overproduction, but
white and wiped down each shift with white cloths. Itspecifically addresses inventory within the process.
becomes easy to see any unusual oil leaks or dirt.For example, process step A produces twice as
This allows the factory workers to diagnose machinemany components as needed for process step B.
problems before breakdowns occur. The result isThe excess must be moved or stored (waste of
reduced cost.transportation). What would be the impact on
Standardization is about making sure that importantoperating cost if the process were changed the next
elements of a process are performed consistentlyday, making the stored "in process" inventory
and in the safest and best possible way. Lack ofobsolete?
consistency will cause a process to generate defectsAnother waste of inventory would be running out of
and compromise safety. The standardization of worka needed assembly component, thus shutting down a
practices increases predictability. Predictability, in turn,production line. Similar to this would be a store running
allows the process owners and operators to preventout of an item that is selling well. In either case,
problems before they affect the customer.opportunity is lost. Lost income (sales) is also a form
Sustain means to maintain the gains. The 5-Sof waste.
philosophy will only work if it is consistently appliedThe Waste of Resources
everywhere and all the time. By maintainingThis is the wasteful deployment of resources. This
consistency, not only will gains be maintained, butcould be human or material resources. An example
there will also be improvement throughout thewould be using an untrained person to do a job,
organization as the 5-S philosophy permeates thewhich results in rework, which is a waste of both
work environment. Eventually the philosophyemployees' time. Another would be the purchase of
becomes a part of the business' culture.raw materials in excess of demand, which must then
Finding and eliminating waste within a process orbe stored. The business now has cash assets
business is about mutual respect and trust,(wasted) tied up in stored material that cannot be
empowerment and accountability. Without these,easily liquidated.
waste elimination is impossible. As the eight types ofA process improvement project should focus on the
waste are covered below, consider how mutualelimination or minimization of all causes of waste. In
respect and trust, empowerment and accountabilityorder to do this, process owners must be involved.
would be keys to success.These individuals are the most knowledgeable about
Elimination of Wastewhere waste occurs in a process. Every mind that
Waste is any action that does not add value to thebecomes involved in this endeavor adds to probability
product or service in the eyes of the customer. Thisof success for the improvement team. More minds
is related to process mapping, where there areequal more ideas. In addition, the process owners will
value-added and non-value-added steps in a process.be changing their own process. Do not underestimate
Different organizations may have different categoriesthe power of synergistic thinking.
of waste than those listed below.Lastly, waste reduction is a daily activity and not a
The Waste of Overproductionproject activity. It should be built into the planned
The waste of overproduction is simply making moreprocess changes proposed by the improvement
of a product or service than the customer demands.team so that gains in process performance are
Overproduced goods have to be stored and aremaintained. A process improvement project affects
subject to obsolescence or spoilage. In the long run,the culture of an organization, and because waste
overproduction results in higher wastage and cost. Itreduction is a cultural activity, they go hand in hand.