LAND FOR SALE IN NAIROBI CBD SOUTH EAST COMMERCIAL PARK, NAIROBI

LAND FOR SALE IN NAIROBI CBDMARKETING AND SALES
SOUTH EAST COMMERCIAL PARK, NAIROBI.Marketing of the properties is planned to start even
South East Commercial Park is located within Nairobibefore ground is broken for the start of the
CBD and has over 140 plots available for sale toconstruction. This will serve the dual purpose of
developers. These are the only plots for sale availablecreating awareness of the availability of quality hotel
in Nairobi CBD so it gives a great opportunity for aservice and to confirm the validity of the market
chance to own land and develop commercial propertyintelligence.
in Nairobi CBD.A4architect will undertake marketing through the
Below is a Feasibility study for a Hotel Developmentmass media and especially through the internet using
project showing Return on Investment ofa virtual presentation kit that will include a walk
approximately 1 year.through movie of the development.
Project: Hotel Development in Kenya,FEES STRUCTURE
Nairobi-CBD-South East Commercial Park.Overall fees charged shall be 10% of the final
Client: Mr. J Mcontract sum. The fees shall be spread over the
Location: Nairobi CBD South East Commercial Park.various stages as follows:
  
MAY 2010 
EXECUTIVE SUMMARY 
This is a project proposal for the construction of a 
middle class Hotel on a parcel of land situated at 
Nairobi CBD South East Commercial Park.Fees Due
The project has been conceived, designed and will beA
implemented by for Mr. J. MInception
 Inception and client brief
The estimated development cost for the project isPhysical survey and information review
KES 355,500,000[USD 4,443,750].Sketch design and basic project proposal
The project completion period shall take 12 months5% of fees.
from ground breaking to hand over.B
 Design and design development
Return on Investment shall be in a period of 1 year.Final design and presentation with budget estimates
Total gross anticipated income per annum includingFinal specifications
food and beverage salesEngagement of consultants and preparation of
=388,800,000.00[4,860,000.00]electrical, structural and mechanical servicesdrawings
 Development approvals
 30% of fees.
C
A4architect is a dynamic property consultingPre-tender process
company specializing in providing a one-stop servicePreparation of tender documents for general and
for the management and development of a varietyspecialist contractors
of property development projects. It provides itsIdentification of suppliers for client supplied items to
clients, who may be property owners, developers orbe fixed by contractors
tenants, with the expertise to guide a projectShort listing of general and specialist contractors
through the complex development process from10% of fees.
concept through to building completion.D
Depending on the requirements of their client,Tender process
A4architect can provide a full or partial consultingTendering for general and specialist contractors
service. The company's involvement can vary fromTender analysis
sourcing suitable sites, arranging local authorityContract award by client on advice of Project
approvals, managing the professional team orManager
providing a complete project management service.15% of fees.
The principals behind the firm have several yearsE
experience in designing and managing to completionProject Administration
several projects of various natures as part of designCo-ordination meetings conducted by Project
and implementation teams for leading ProjectManager
Management firms in Kenya as well as theClose control of work schedule
Government of the Republic of Kenya.Monitoring of quality of works and ensuring
 compliance with specifications
THE PROJECT15% of fees.
The project comprises the construction of residentialF
units for at South East Commercial Park, Nairobi on aProject Accounting
subdivision measuring just about 0.25 acres.Budget control
The overall theme of the development would be oneCertification of stage/progress payments
of maximizing on the plot use whilst maintaining10% of fees.
reasonable individual privacy for occupants. The 
selection of the type and size of units to be erectedG
as well as their layout has been done with theProject closeout
foregoing being foremost -A scenario where theCompletion inspection with client
property is developed to target the middle incomePreparation of final account in conjunction with
bracket.general and specialist contractors
 Preparation of schedule of making good defects
 10% of fees.
PHASED CONSTRUCTION 
In order to ease the impact of the overall cost ofH
the development it is proposed to carry out thePost contract administration
construction in phases to be jointly agreed on withFinal inspection after elapse of defects liability period
the client. The project can be phased in terms ofConfirmation of making good defects after retention
vertical floor levels per floor as agreed with the client.period is over
In order to enable planning of major infrastructural5% of fees.
requirements such as water storage and soil waterTotal
disposal right from the outset, a master plan of the100% of fees.
entire development shall be evolved. Thus theNotes on fees structure
capacity of some of the facilities may initially exceed1. Negotiations and any other work arising from the
the needs of the accommodation provided, but thissubmission of application to the Local Authority or
would be done with the full knowledge that thethe submission of application to the local authority of
development will grow to fully utilize the facilitiesthe statutory bodies constitutes additional services to
provided.be charged for on a time basis.
Auxiliary features would include paved driveways and2. Normalization of contract will be by the signing of
parking, extra water storage and planted landscapedboth copies of a document mutually agreeable to
gardens. The country ambience would further beboth parties.
enhanced by having strategically planted trees which3. Fee notes which will be issued on completion of
would serve the added role of acting as wind breaks.stage B, C & D respectively. Fee notes for
 stage (A), & (B) will be based on Project
 Estimates at those stages.
DEVELOPMENT BUDGET4. The payment from stages E to H will be based on
The development budget is as follows:the final project costs. These will be paid on a
 pro-rata basis as the project progresses and will be
80 No. self-contained accommodation rooms per floorsubmitted immediately following the issue of
for 5 No. Floors=400 No. Accommodation rooms.certification of contractor stage payments.
Cost of construction per room fully furnished=KES5. In the event that the client selects a phased
40,000 per square meter.implementation of the project, fee notes for stages
Area for each unit =16m2.A, B and C shall be based on the estimated cost for
Total cost of construction for 400units = KESthe entire project while fee notes for subsequent
256,000,000[USD 3,200,000]phases shall be pro-rated to the value of the phase
Cost of construction for Restaurant, Kitchen, Laundrybeing implemented.
and Offices=6. All fee notes will be processed, authorized and paid
Restaurant-60m2within ten calendar days of the fee note date.
Kitchen=30m27. Reports or opinions requiring formal client approval
Offices-20m2are to be discussed and approved within five working
Laundry-20m2days of receipt of the request from the project
Store-30m2managers by the client.
Total =160m2.8. Disbursements resulting from the execution of the
Total estimated cost of construction = KESconsultant's duties including reproduction of drawings
355,500,000[USD 4,443,750]and documents, fax messages, traveling and food
 and accommodation expenses outside Nairobi etc. do
 not form part of this agreement and will be charged
 at cost.
  
1.00 Building detailsPrepared By
1.10 Type of unit :middle class hotel units.Frank Gichuhi
1.11 Number of floors :5+254 721 410684
1.12 Number of units in each floor :40A4architect.
1.13 Gross floor area per Unit m2: 16INFRASTRUCTURE SYSTEM  WITHIN SOUTH
1.14 Building Cost per m2-fully furnished :40,000EAST COMMERCIAL PARK
1.15 Building cost per unit :KES 640,000 [USD 8,000]Existing Traffic System
  
1.16 Overall building cost : KES 260,000,000[USDRoads
3,250,000] 
2.00 Construction costThe site is served by Landhies road on one side and
2.10 Preliminaries      6,500,000.00   [USDRailway lane on the other.
81,250]          2.5% of item 1.16The existing road system and road reserve is not
2.11 Building works  KES 260,000,000[USD 3,250,000]adequate to meet the traffic demand envisioned in
2.12 Infrastructure      39,000,000.00  [USDthe site. The existing traffic system will be replaced
487,500]          15.00% of item 1.16with a more comprehensive road network.
  
 Motor Traffic
 The site experiences heavy motor traffic from public
2.13 Subtotal - Construction cost 305,500,000.00 [USDservice vehicles to and from the Muthurwa bus stage
3,818,750]which increases during rush hours in the mornings and
3.00 Incidental costsevenings.
3.10 Professional fees 26,000,000.00[USDLandhies road also has heavy traffic through out the
325,000]    10.00% of item 1.16day which peaks during early morning and evenings.
  
3.12 Land Cost- [0.25 acres]  KES 50,000,000.00 [ 
USD 625,000]Pedestrian Traffic
OVERALL PROJECT COST 305,500,000.00 +The site experiences heavy pedestrian traffic along
50,000,000= KES 355,500,000[USD 4,443,750]Landhies road. Pedestrian walkways along Landhies
INCOME PROJECTIONSroad will be enhanced. A service lane along Landhies
1.10  Accomodation Unitsroad will be incorporated to as to serve the plots
1.11 Projected  price/unit per day KES 2,500 [USDalong the busy road..
31.25]The proposed developments will result to heavy
Occupancy rate-90%pedestrian traffic within the site.
1.12 Overall room sales revenue per month=KESProposed Traffic System
27,000,000[USD 337,500]Motor Traffic
1.13 Gross anticipated income per annum[room sales] 
=KES 324,000,000[USD 4,050,000]The envisioned developments will result in an increase
TOTAL GROSS ANTICIPATED INCOME PER ANNUMin motor traffic. An elaborate road network within
INCLUDING FOOD AND BEVERAGE SALESthe site has been laid out. All developments will front
=388,800,000.00[4,860,000.00]a wide road and have a service lane at the back that
1.14 Return on Investment/Repayment period=is 6m wide.
Approx. 1 year.The main entrance to the site along Landhies road is
 served by a 25m wide road that connects Landhies
 road to Railway Lane. This road provides the
 necessary carriageway to serve the envisioned
LOCATIONincrease in traffic and also provide adequate
South East Commercial Park is a new extension ofoff-street parking and road reserve for future
Nairobi CBD and  is situated within Nairobi's Centralexpansion. Approximately 190 car parks can be
Business District along LANDHIES Road. The Southaccommodated along this road.
East commercial park is served by an all weather 
road with the site of the proposed construction beingAnother 25m wide road has been proposed between
found 15 kilometers from the Jomo Kenyattathe main entrance road and the KPLC plot-to serve
International Airport.the 2nd row of developments from Landhies road.
South East Commercial Park is connected to theThis can accommodate approximately 320 roadside
mains water supply from the Nairobi City Council andcar park spaces.
also has easily connected electricity supply. 
The immediate locality consists of subdivisions eachA 30m wide road along railway lane is proposed
measuring an eighth an acre. Developments in thiswithin the site. This can accommodate approximately
area are commercial in nature. The majority of the550 cars on road-side parking.
buildings here are well constructed and maintained. 
 18m wide roads can accommodate approximately
 500 cars in roadside angle parking.
 15m wide roads can accommodate an average of
MARKET DESCRIPTION350cars in road-side parking.
Given the proximity of the site to Nairobi's CBD as12m wide roads can accommodate 360 cars in
well as the good communication available, the siteroadside parking.
would realize good returns on a hotel development.6m wide roads have been proposed to act as
The site is located 15 km from an Internationalservice lanes at the back of each plot. These can
airport and is opposite the largest bus park in Eastaccommodate 126 cars in road-side flush parking.
Africa.All these roads  will provide an estimated 2400
The planned development intends to maximize thisroad-side car park spaces.
potential by creating accommodation that is spaciousA  0.2 Ha. Plot along Railway lane near the Jogoo
whilst at the same time making optimum use of theroad roundabout has been designated for
space available.development into a parking silo.
Currently, most Hotels in Nairobi CBD experience aAnother 0.2 Ha. plot along Landhies road near the
near 100% occupancy rate on a daily basis. TheKPLC plot has also been ear-marked for development
planned development would thus meet an existinginto a parking silo.
need.A combination of off-street parkings and the two
 parking silos will adequately cater for the increased
 vehicular traffic within the site.
  
COMPETITION 
In the locality of the planned development, there are 
no hotels which cater for the middle class. The 
closest competition perhaps comes from the low 
cost hotels in Gikomba area. These are however notPedestrian Traffic
impressive in terms of the room sizes and quality of 
service offered.An increase in pedestrian traffic is envisioned within
 the site.
SALES PROJECTIONSThe proposed roads have a width of adequate space
It is planned to start marketing the developmentto cater for concrete pavement pedestrian walk
even as the construction begins.ways on both sides of the road.
The room sale price for each unit has been set at 
KES 2,500[31.25USD]. This is the average charged byRoads and Access
comparable hotels such as Kahama hotel in Ngara and 
Blue Hut hotel along Park road. The price is justifiedCurrently the site has only one inlet along Landhies
by the upgraded quality of the planned developmentroad. 6 new access points have been proposed into
in terms of finishes, design, and quality of service.the site along Landhies road.
EXECUTION OF THE PROJECT 
A4architect will in this provide the client with a fullCurrently, the only access into the site along Railway
design/build service. This shall includelane is through Muthurwa Bus park.
 8 new access openings have been proposed.
1. Design and specification 
Architectural, structural, mechanical and electricalThese access points will reduce any chances of
drawings shall be prepared and necessary approvalstraffic congestions at the entry and exit points during
sought.rush hours.
During the various stages of the design, the clientAll developments will be serviced by the main road at
shall be kept fully informed and client approval soughtthe front and a 6m wide service lane at the rear.
prior to proceeding to the next stage. TheAll roads have been proposed to have a 6m wide
engineering design shall be done by registeredminimum carriageway with asphaltic concrete surface
engineers under the guidance of A4architect. Detailedtreatment.
specifications shall be developed with closeStreet lights have been proposed to be installed along
consultation with the client.the roads.
  
2. Project estimatesSERVICES AND UTILITIES
Subsequent to completion of the design, a firm 
estimate shall be done for the projectWater Supply.
 The site has an existing water supply from the
 Nairobi City Council.
 The proposed developments will not be adequately
3. Preparation of tender and contract documentscatered by the existing water supply network.
After final design has been done and client approvalA new water supply network is proposed to run
obtained, tender documents shall be drawn up foralong the access roads and serve each plot.
the general and specialist contractors. The specialistThe water will be supplied by Nairobi City Council.
contract documents shall be prepared with guidance 
from the relevant engineers. 
  
4. TenderingFoul Water Disposal
Selected contractors shall be invited to tender forCurrently the site is connected to the Nairobi City
the various work packages. We shall then analyzeCouncil sewer system.
the tenders returned and forward ourThe proposed developments will not be adequately
recommendation to the client.covered by the existing sewer system.
 A new sewer system is proposed to run along the
5. Contract documentationroad reserve to serve each plot and connect to the
With the contractors have been selected, we shallmain Nairobi City Council sewer line.
draw up the required contract documents and enter 
into contract with the contractors on the client'sStorm Water Drainage
behalf. 
 Currently the site is connected to the Nairobi City
 Council storm water drainage system.
 The proposed developments will require a new storm
6. Project managementwater drainage system to be installed. This will
Subsequent to the contracts being signed andconnect to the Nairobi City Council storm water
mobilization to the site, we shall providedrainage system.
superintendence and project management. This will 
entail ensuring that the project is brought in on time 
and under budget by constant monitoring of 
operations on site and remedying any issues that 
may prevent timely completion or cause expenditureElectricity Supply
to exceed the budget. 
 There is already an existing Electricity supply system
7. Contract administrationfrom KPLC.
We shall handle all matters relating to the variousThe proposed developments will not be adequately
contracts including but not limited to stage payments,served by the existing power supply system. A new
performance bonds, extensions of time andpower supply system is proposed to serve each plot.
relationships between the various traded involved in 
the project's execution.Electricity supply is connected to the property and is
 adequate to meet the demand from the proposed
8. Sales and marketingdevelopment.
In conjunction with an estate agency approved by 
the client, we shall produce a presentation packageTelephone and Internet Services
to be used in the sales and marketing of the units. 
 A fibre-optic underground cable supply network has
PROJECT TIMELINESa) Design to Tenderbeen proposed to serve the  site and will  run along
The design to tender process will take a total of 2the roads on specially constructed ducts to serve
months. This will include commissioning of alleach plot.
engineering design, preparation of bills of quantities 
and obtaining of all relevant approvals for theSolid Waste Disposal
development.b) Construction 
Construction of the entire project is estimated toSolid waste disposal services are proposed to be
take a maximum of 10 months.provided by the Nairobi City Council and private solid
 waste disposal companies.
  
 Frank Gichuhi
 Architect.